Tipperary
2006:1809
Site AR34, Ballyerk
Post-hole
219329 156823
E2377
Additional excavation was carried out in October 2006, in advance of the construction of the M8/N8 Cullahill to Cashel road improvement scheme. Prior assessment and centreline test-trenching was carried out in 2005 by Bernice Molloy (Excavations 2005, No. 1388, A027/006). An area of 400m2 was topsoil-stripped around a shallow post-hole and an area of in situ burning was revealed in testing. The landowner indicated that considerable tree clearance had been carried out in the field in recent years. It is likely that these features are associated with this field clearance rather than archaeological in nature.
Colum Hardy, for Valerie J. Keeley Ltd, Brehon House, Kilkenny Road, Castlecomer, Co. Kilkenny.


Back to 2006 County Tipperary Site List

Back to 2006 County List

Back to Year List


Copyright for the database resides with Wordwell Ltd in association with the Department of Arts, Heritage and the Gaeltacht and the Department of the Environment, Northern Ireland, and for the individual reports with the authors.
Site designed by Aisling Flood, Wordwell Ltd. Database software and hosting by HostIreland.

Duchas logoHeritage Council logo