Meath
2008:932
Ardsallagh/Dowdstown/Lismullin/Skreen
No archaeological significance
263100 290000; 262328 290105; 262259 293280; 261705 294052; 260489 294180
A008/087; E3996
Additional test-trenching was carried out along sections of the proposed route of the M3 Clonee to North of Kells road scheme, Contract 2, in County Meath on behalf of Meath County Council National Roads Design Office and the National Roads Authority. This additional work was carried out in the townlands of Ardsallagh, Dowdstown, Lismullin, and Skreen (Areas 1–6). The areas at Ardsallagh and Lismullin were not previously assessed during the initial phase of assessment works as access was not permitted into these woodland sites. Additional works were carried out in the townlands of Dowdstown and Skreen (Areas 1–6) in order to determine the archaeological significance of anomalies detected as a result of additional geophysical surveys carried out in spring 2007. These additional surveys were carried out where no archaeological features were discovered during the initial phase of assessment works in spring/summer 2004. Trenches were excavated using a tracked machine equipped with a 2m-wide toothless ditching bucket. No features of archaeological significance were identified and no finds were recovered.
Lydia Cagney, Gearóid Kelleher and Linda Clarke, ACS Ltd, Unit 21, Boyne Business Park, Greenhills, Drogheda, Co. Louth.


Back to 2008 County Meath Site List

Back to 2008 County List

Back to Year List


Copyright for the database resides with Wordwell Ltd in association with the Department of Arts, Heritage and the Gaeltacht and the Department of the Environment, Northern Ireland, and for the individual reports with the authors.
Site designed by Aisling Flood, Wordwell Ltd. Database software and hosting by HostIreland.

Duchas logoHeritage Council logo